Menu
Your Cart

Automotive Test Lead Set/2-way clip, large jaws, long leads, spring loaded copper clips. Includes: 1 ea. red and 1 ea. black

Automotive Test Lead Set/2-way clip, large jaws, long leads, spring loaded copper clips. Includes: 1 ea. red and 1 ea. black
Out of Stock
Automotive Test Lead Set/2-way clip, large jaws, long leads, spring loaded copper clips. Includes: 1 ea. red and 1 ea. black
AUTOMOTIVE TEST LEAD SET/2-way clip, large jaws, long leads, spring loaded copper clips. Includes: 1 ea. red and 1 ea. black

Write a review

Note: HTML is not translated!
Bad Good
Captcha
  • Stock: Out of Stock
  • Manufacturer Part #: TL28A
$0.00

Aircraft Fitment Finder

Returns & refund summary

  • 30-day return window — with prior return authorization, unopened in original packaging.
  • Restocking fee: 20% on unopened items, 30% on open-box items.
  • Refund processing fee: 5.51% applies only to customer-remorse returns and customer-initiated cancellations. If a problem is our fault (our cancellation, unavailability, wrong item, confirmed defect, or shipping damage) your refund is 100% with no fees.
  • Return shipping: paid by buyer on customer-remorse returns; we pay return shipping when the problem is our fault.
  • Non-returnable categories: installed/used parts, special-order or rebuilt items, programmed items (incl. ELTs), batteries, AOG-priority orders, international orders.

Full terms: Return Policy.

Authenticity & authorization

We source products from manufacturers, authorized distributors, and established aviation suppliers as applicable. We are an independent reseller; we do not claim direct dealer or authorized-representative status for any brand. Documentation, source, and warranty eligibility vary by product and are confirmed on request.

See our full Manufacturer Authorizations page for the current per-brand status.

Need traceability paperwork?

If your installation requires FAA Form 8130-3, manufacturer Certificate of Conformance, or other traceability documentation, please call 1-877-722-8727 or email [email protected] before placing the order so we can confirm what is available for this part.

Shipping

Standard ground, expedited, and AOG shipping options are available at checkout. Full shipping-cost tiers and timelines are published on our Delivery Information page.